22/05/2019
Have you noticed a road works along the John F. Kennedylaan and D. Eisenhowerlaan in Ghent recently?
In collaboration with R4WO Abesim did core drillings for the Werkvennootschap in function of the construction of the turbo traffic square at the "Eurosilo" junction. Wherever possible, the drillings were made on the breakdown strip, so that inconvenience was kept to a minimum. For the drillings that took place on the roadway, at least one lane was always available for vehicles. A passage for cyclists was guaranteed at all times.